Dielectric tests : 
To check characteristics of Circuit breaker for the following tests:
I) Dry, wet, power frequency
II) Lightning impulse voltage
III) Switching impulse voltage ( applicable for 420 kV CB and above)

Radio Interference voltage test :
To determine RIV on CB pole in both close & open position

Resistance of the main circuit : 
To record circuit resistance during temp. rise test at 200 C

Temp. rise test : 
To ensure capability of contacts to carry rated normal current within specified temp. rise limits

Short-time withstand current & peak withstand current : 
To check the ability of the circuit to carry the maximum rated short-circuit withstand current ( 2.5 times the RMS value) at 50 Hz in close position during the specified short-term duration of 1 or 3 sec.

Mechanical operation test at ambient temp :
To check the characteristics of the breaker for 2000 operations on each pole ( with multiple circuit breaker with individual drive) OR complete assembled breaker (mechanically gang-operated breaker with one common drive)

Short-circuit current making/ breaking tests : 
To check ability of the CB to clear the current on different tests in symmetrical & asymmetrical conditions as per provisions of IEC

Capacitive current charging tests:
-Line charging current breaking tests
-Cable charging current breaking tests
To check withstand capability of the CB for no load transient lines, cables , and capacitor banks

ROUTINE TESTS
1- Dielectric test on main circuit
To check the dielectric’s withstand capability of live terminals to live terminals and to earth in both close & open condition of CB

2- Dielectric test on auxiliary & control circuit :
To check the dielectric’s withstand capability of auxiliary & control circuit of CB subject to short duration (60 sec) voltage withstand test for 2 kV . ( For motor or other devices , they are subjected to a dielectric test as per appropriate specs.)

3- Design identification test : 
Verifies the CB for compliances in terms of language of name plate, identification of aux. Equipment, colour & quality of paint etc.

4- Mechanical operating test :
Includes
1) 5 open-close operations at max. rated and minimum control voltage
2) 5 close-open operation at rated control voltage
3) recording opening & closing times at the rated operating pressure & voltage

5- Measurement of resistance of main circuit :
To record contact resistance of CB for mechanical operations to be within specified limits